Waukesha South Turf Project 5/28-8/1

http://cdn4.sportngin.com/attachments/photo/3743/5928/photo-20_thumb.JPG
  • We are done

  • Blackshirt Logo

  • Sewing in the numbers

  • Last ten yards of turf.

  • 50 yards to go.

  • 70 yards to go.

  • First piece of Turf.

  • Laying the sand.

  • Laying the stone

  • Installing the drainage system

  • Laying the stone

  • Drainage system and concrete curb

  • All top soil removed.

  • Getting ready to move dirt.

  • All top soil pushed to the center of the field

  • Time to remove the grass.

  • Ground Breaking Ceremony May 28, 2014

Loading…

Waukesha South Turf Project 5/28-8/1